Texas land feasibility & buildability

Much of Texas has no county zoning at all. Buildability is instead controlled by recorded deed restrictions, subdivision plats, city ETJ rules, on-site sewage facility (OSSF) sizing, and groundwater availability.

Statewide rules that decide buildability in Texas

  • Counties generally cannot zone; unincorporated land is governed by subdivision and OSSF rules.
  • Cities regulate land within their extraterritorial jurisdiction (ETJ) through platting.
  • OSSF permits are issued by the county or an authorized agent under TCEQ rules.
  • Groundwater conservation districts may limit or permit well production.

What LotAnalyst checks automatically

  • Parcel area versus the zoning district minimum lot size, including legal non-conforming lots of record.
  • Front, side, and rear setback envelope and the resulting buildable footprint.
  • USGS 3DEP slope profile and grading implications.
  • Sewer availability versus septic feasibility and perc evidence.
  • FEMA flood zone, wetlands indicators, and stream or riparian buffers.
  • Road frontage and legal access, including landlocked parcels.

Texas county zoning guides

See what a finished report looks like

Walk through a complete Land Feasibility Blueprint on a real parcel — USGS 3DEP slope profile, zoning and setback math, planning-office checklist, and full ARV/MAO underwriting.

Figures on this page are typical ranges compiled from published ordinances and public data for orientation only. Districts, overlays, and setbacks change — always verify the governing zoning district, minimum lot size, buffers, and septic requirements with the county planning office and health department before you buy or build. Read the full disclaimer.